{"id":6901,"date":"2021-03-11T16:01:08","date_gmt":"2021-03-11T16:01:08","guid":{"rendered":"https:\/\/swefc.unm.edu\/iamf\/?page_id=6901"},"modified":"2022-03-21T18:45:56","modified_gmt":"2022-03-21T18:45:56","slug":"life-cycle-costing-long-term-replacement-plans-overview","status":"publish","type":"page","link":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/","title":{"rendered":"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; custom_padding_last_edited=&#8221;on|tablet&#8221; admin_label=&#8221;Popup &#8211; #undefined&#8221; _builder_version=&#8221;4.8.1&#8243; _module_preset=&#8221;default&#8221; positioning=&#8221;none&#8221; horizontal_offset_tablet=&#8221;&#8221; horizontal_offset_phone=&#8221;&#8221; horizontal_offset_last_edited=&#8221;on|tablet&#8221; custom_margin=&#8221;0px||||false|false&#8221; custom_margin_tablet=&#8221;&#8221; custom_margin_phone=&#8221;&#8221; custom_margin_last_edited=&#8221;on|desktop&#8221; custom_padding=&#8221;0px|||0px|false|false&#8221; custom_padding_tablet=&#8221;|||25px|false|false&#8221; custom_padding_phone=&#8221;&#8221; da_disable_devices=&#8221;off|off|off&#8221; custom_padding__hover_enabled=&#8221;on|desktop&#8221; da_is_popup=&#8221;off&#8221; da_exit_intent=&#8221;off&#8221; da_has_close=&#8221;on&#8221; da_alt_close=&#8221;off&#8221; da_dark_close=&#8221;off&#8221; da_not_modal=&#8221;on&#8221; da_is_singular=&#8221;off&#8221; da_with_loader=&#8221;off&#8221; da_has_shadow=&#8221;on&#8221;][et_pb_row _builder_version=&#8221;4.8.1&#8243; _module_preset=&#8221;default&#8221; width=&#8221;100%&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.8.1&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.9.2&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2>Long-Term Replacement Planning<\/h2>\n<p>&nbsp;<\/p>\n<p>As the system works to develop Life Cycle Costing data on all the assets, there will be a point where the data will provide information on the costs of maintenance, repairs, and replacements for the assets. This information will be used to optimize the operation, maintenance, repair, rehabilitation, and replacement expenditures, which is the goal of Life Cycle Costing. However, the system does not have to wait for the database to be fully built out and the costs optimized to begin utilizing it.<\/p>\n<p>As a system implements its asset management program, the available data can be used to begin developing long-term replacement plans. This allows the system to look at incomes and budgets and adjust in advance of a large expenditure or need.<\/p>\n<p>To develop these long-term plans a system will want to develop a <a href=\"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-capital-improvement-plans\/\">Capital Improvement Plan<\/a> (CIP) and perform Business Case Evaluations. The <span class='et-tooltip'>CIP<span class='et-tooltip-box'>Capital Improvement Plan<span class='et-tooltip-arrow'><\/span><\/span><\/span> will allow the system to see what projects are needed when. The <a href=\"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-business-case-evaluations\/\">Business Case Evaluation<\/a> allows the system to have a deeper look at high dollar projects to ensure projects are needed and that all the options for project development have been fully considered, including options for non-asset solutions or alternatives that might not include replacing the asset with a similar asset. This process allows the system to optimize construction funds.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Long-Term Replacement Planning &nbsp; As the system works to develop Life Cycle Costing data on all the assets, there will be a point where the data will provide information on the costs of maintenance, repairs, and replacements for the assets. This information will be used to optimize the operation, maintenance, repair, rehabilitation, and replacement expenditures, which is the goal of Life Cycle Costing. However, the system does not have to wait for the database to be fully built out and the costs optimized to begin utilizing it. As a system implements its asset management program, the available data can be used to begin developing long-term replacement plans. This allows the system to look at incomes and budgets and adjust in advance of a large expenditure or need. To develop these long-term plans a system will want to develop a Capital Improvement Plan (CIP) and perform Business Case Evaluations. The <span class='et-tooltip'>CIP<span class='et-tooltip-box'>Capital Improvement Plan<span class='et-tooltip-arrow'><\/span><\/span><\/span> will allow the system to see what projects are needed when. The Business Case Evaluation allows the system to have a deeper look at high dollar projects to ensure projects are needed and that all the options for project development have been fully considered, including options for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<!-- wp:divi\/placeholder \/-->","_et_gb_content_width":"","footnotes":""},"class_list":["post-6901","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Life Cycle Costing \/ Long Term Replacement Plans \/ Overview - Integrated Asset Management Framework<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview - Integrated Asset Management Framework\" \/>\n<meta property=\"og:description\" content=\"Long-Term Replacement Planning &nbsp; As the system works to develop Life Cycle Costing data on all the assets, there will be a point where the data will provide information on the costs of maintenance, repairs, and replacements for the assets. This information will be used to optimize the operation, maintenance, repair, rehabilitation, and replacement expenditures, which is the goal of Life Cycle Costing. However, the system does not have to wait for the database to be fully built out and the costs optimized to begin utilizing it. As a system implements its asset management program, the available data can be used to begin developing long-term replacement plans. This allows the system to look at incomes and budgets and adjust in advance of a large expenditure or need. To develop these long-term plans a system will want to develop a Capital Improvement Plan (CIP) and perform Business Case Evaluations. The will allow the system to see what projects are needed when. The Business Case Evaluation allows the system to have a deeper look at high dollar projects to ensure projects are needed and that all the options for project development have been fully considered, including options for [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/\" \/>\n<meta property=\"og:site_name\" content=\"Integrated Asset Management Framework\" \/>\n<meta property=\"article:modified_time\" content=\"2022-03-21T18:45:56+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/life-cycle-costing-long-term-replacement-plans-overview\\\/\",\"url\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/life-cycle-costing-long-term-replacement-plans-overview\\\/\",\"name\":\"Life Cycle Costing \\\/ Long Term Replacement Plans \\\/ Overview - Integrated Asset Management Framework\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/#website\"},\"datePublished\":\"2021-03-11T16:01:08+00:00\",\"dateModified\":\"2022-03-21T18:45:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/life-cycle-costing-long-term-replacement-plans-overview\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/life-cycle-costing-long-term-replacement-plans-overview\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/life-cycle-costing-long-term-replacement-plans-overview\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Life Cycle Costing \\\/ Long Term Replacement Plans \\\/ Overview\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/#website\",\"url\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/\",\"name\":\"Integrated Asset Management Framework\",\"description\":\"Combining Green and Gray Assets\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/swefc.unm.edu\\\/iamf\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview - Integrated Asset Management Framework","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/","og_locale":"en_US","og_type":"article","og_title":"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview - Integrated Asset Management Framework","og_description":"Long-Term Replacement Planning &nbsp; As the system works to develop Life Cycle Costing data on all the assets, there will be a point where the data will provide information on the costs of maintenance, repairs, and replacements for the assets. This information will be used to optimize the operation, maintenance, repair, rehabilitation, and replacement expenditures, which is the goal of Life Cycle Costing. However, the system does not have to wait for the database to be fully built out and the costs optimized to begin utilizing it. As a system implements its asset management program, the available data can be used to begin developing long-term replacement plans. This allows the system to look at incomes and budgets and adjust in advance of a large expenditure or need. To develop these long-term plans a system will want to develop a Capital Improvement Plan (CIP) and perform Business Case Evaluations. The will allow the system to see what projects are needed when. The Business Case Evaluation allows the system to have a deeper look at high dollar projects to ensure projects are needed and that all the options for project development have been fully considered, including options for [&hellip;]","og_url":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/","og_site_name":"Integrated Asset Management Framework","article_modified_time":"2022-03-21T18:45:56+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/","url":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/","name":"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview - Integrated Asset Management Framework","isPartOf":{"@id":"https:\/\/swefc.unm.edu\/iamf\/#website"},"datePublished":"2021-03-11T16:01:08+00:00","dateModified":"2022-03-21T18:45:56+00:00","breadcrumb":{"@id":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/swefc.unm.edu\/iamf\/life-cycle-costing-long-term-replacement-plans-overview\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/swefc.unm.edu\/iamf\/"},{"@type":"ListItem","position":2,"name":"Life Cycle Costing \/ Long Term Replacement Plans \/ Overview"}]},{"@type":"WebSite","@id":"https:\/\/swefc.unm.edu\/iamf\/#website","url":"https:\/\/swefc.unm.edu\/iamf\/","name":"Integrated Asset Management Framework","description":"Combining Green and Gray Assets","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/swefc.unm.edu\/iamf\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/pages\/6901","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/comments?post=6901"}],"version-history":[{"count":9,"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/pages\/6901\/revisions"}],"predecessor-version":[{"id":24998,"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/pages\/6901\/revisions\/24998"}],"wp:attachment":[{"href":"https:\/\/swefc.unm.edu\/iamf\/wp-json\/wp\/v2\/media?parent=6901"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}